TMR to have traffic hell from REM sites
The Town of Mount Royal is going to endure traffic hell next year as the REM site means they’ll have to see two of their main roads, which are basically bridges over the tracks, rebuilt to code. One of these roads is Jean-Talon.
Given the chaos TMR is choosing to inflict on the whole city with the Royalmount project, I find I do not have a violin small enough for this story. 🎻
Bert 18:42 on 2019-11-29 Permalink
What they could do is open up the level crossing that is currently pedestrian and-or build a temporary bridge, using back-fill. There are no trains to interrupt.
mare 21:56 on 2019-11-29 Permalink
@Bert They might use the rails to transport building materials and equipment. At least I’d do that.