Pie-IX bridge work to start this fall
Delayed from the original planned start a year ago, work on rebuilding the Pie-IX bridge over the back river should start this fall. It’s meant to be a link in the SRB Pie-IX.
Delayed from the original planned start a year ago, work on rebuilding the Pie-IX bridge over the back river should start this fall. It’s meant to be a link in the SRB Pie-IX.
Reply