Green line is down for awhile
The metro’s green line is down till 2 pm between Angrignon and Berri-UQÀM. A gas line was broken at a construction site near Atwater and has to be fixed.
…Seems like the line is back in service now.
The metro’s green line is down till 2 pm between Angrignon and Berri-UQÀM. A gas line was broken at a construction site near Atwater and has to be fixed.
…Seems like the line is back in service now.
Max 18:34 on 2020-10-06 Permalink
Funny that both articles fail to mention that the construction site in question was part of the metro itself. They’re redoing the waterproof membrane of the Atwater station:
http://www.stm.info/en/info/service-updates/stm-works/atwater
Of course I had to pick this afternoon to run an errand at Westmount Square 🙁