Work begins at the Musée d’art contemporain
The Musée d’art contemporain has been closed for some time, but demolition work has finally begun. The museum is expected to reopen only in 2028.
The Musée d’art contemporain has been closed for some time, but demolition work has finally begun. The museum is expected to reopen only in 2028.
DeWolf 00:16 on 2024-12-08 Permalink
The previous design was no masterpiece but at least it was distinctive. The expansion will be a generic glass box, similar to what has been done to the TNM just down the street (which also erased a more distinctive design by Dan Hanganu).
Beyond the design, it says a lot about the sad state of culture in this country when Canada’s leading contemporary art museum will have been closed for more than seven years for a pretty modest expansion. Meanwhile, the Vancouver Art Gallery just cancelled plans for its new building — which was designed by Herzog & de Meuron, who did the Tate Modern and many other beautiful structures — and will go back to the drawing board to find something cheaper.