Earth collapses under tracks near canal
Train tracks started to collapse near the REM construction site by the Lachine Canal Thursday, after vibratory pile-driving on the site.
Train tracks started to collapse near the REM construction site by the Lachine Canal Thursday, after vibratory pile-driving on the site.
Ephraim 15:04 on 2019-09-20 Permalink
We names that bridge in the photo “Pont Pauline Marois”. It goes no where, does nothing, was useful at one time, etc. etc. etc.
ant6n 20:28 on 2019-09-20 Permalink
That bridge is annoying. Basically this is a heritage site, that turning rail bridge and the Wellington tower there. So they put that concrete-ramp-bridge there in order not to touch that turning rail bridge. It would’ve been much better visually if they’d built a bridge next to the existing CN bridge across the Lachine canal, and then figured out the ramp situation (to get across the CN tracks and yards etc.) a bit further South.
This set up also makes a possible shared system between REM and heavy trains (ARTM, VIA) more difficult if they ever decided to fix the mess they’re creating now, because heavy rail trains would need a way to get off the REM tracks at that point, which is not really possible with the current layout.
This project is such a mess.
Faiz Imam 01:26 on 2019-09-21 Permalink
One other thing you may not be aware of, but the final location of the Bassin peel station is still not confirmed.
The initial plans were a station right by the Basin, but its being speculated that there will now be TWO stations. One further north between Dalhousie and Ottawa st, and another south of the Basin designed to integrate with whatever mega-project happens there, with or without a Baseball stadium.
This would be much better for ETS and residents of griffintown, but we shall see if that’s actually finalized.